YIDA FACTORY · SHENYANG

Pallet Racking Manufacturing in China

Steel forming, punching, welding, powder coating and packing for warehouse racking.

Our Shenyang factory produces pallet racking, shelving, cantilever racking and mezzanine systems. Explore the processes and packing options for your order.

Inside the Shenyang Yida production workshop
Inside the Shenyang Yida production workshop

01 / MATERIALS

Steel materials

Steel coils and sections are the starting materials for racking components.

Steel coils in the materials storage area
Steel coils in the materials storage area

02 / FABRICATION

Forming, punching and welding

Steel-forming equipment at the Shenyang Yida factory
Steel-forming equipment at the Shenyang Yida factory

Profile production

Roll forming and punching are used to manufacture steel racking profiles and components.

Welded components

CO₂ shielded welding is used for fabricated and non-standard components.

OTC equipment and fabrication work area
OTC equipment and fabrication work area

03 / SURFACE TREATMENT

Preparing and finishing the steel

Surface treatment includes electrostatic powder coating. Shot blasting is used to prepare specified hot-rolled components before finishing.

Specify the finish for the intended storage environment when requesting a quote.

Explore Quality & Documentation →

Wrapped goods on a truck in the factory yard
Wrapped goods on a truck in the factory yard

04 / ORDER PREPARATION

Inspection, packing and dispatch

The agreed specification sets the dimensions, quantities and finish for production. Confirm the required inspection records, packing and dispatch documents with the order.

From drawing revision to a shipment-ready order

Keep the drawing, component schedule and packing requirements tied to the same order. The checkpoints below help distributors and contractors define what to review at each stage.

Stage Order checkpoint
Before fabrication Record the drawing revision, component references, quantities, dimensions and load basis. Identify non-standard parts and existing-system interfaces.
Forming and punching Match the specified profiles, lengths and hole patterns to the agreed component schedule.
Welding and coating Identify fabricated assemblies, required finish and colour. Agree which inspection records or photographs are needed for your order.
Packing Define bundle or crate requirements, part labels, package identification and handling needs for the destination.
Dispatch Reconcile the component list and packing list. Confirm shipping terms, requested documents and unloading arrangements.

Agree the handover information with your order

Send your document requirements with the RFQ so availability, format and responsibilities can be agreed before production.

Prepare the order details →

Factory supply for distributors and racking contractors

When comparing pallet racking manufacturers in China, start with the order you need to buy. A wholesale stock order and a customer installation project require different component schedules and handover information.

Purchase type Information to send Confirm in the quotation
Distributor stock or replenishment Product types, dimensions, quantities by component and delivery destination. Order quantities, component references, finish, packing and production timing for the requested specification.
Contractor project supply Drawing revision, row arrangement, pallet dimensions, load requirements and handling equipment. Supplied components, drawing responsibilities, requested installation information and the boundary between factory supply and local site work.
Existing-system extension Original manufacturer, profile and connector details, drawings and photographs. Compatibility review before ordering. Appearance alone does not establish interchangeability.

Which racking system should I request?

Start with selective pallet racking specifications and beam-level loads for forklift-served pallets, cantilever arm configurations for long materials, or long span shelf sizes and loads for hand picking. Include stored goods, pallet sizes, required access and available space. If the system is still undecided, describe those requirements through our racking design enquiry.

See our supply arrangements for distributors, installers and integrators for the commercial scope behind these configurations.

Are minimum quantities and lead times fixed?

Request confirmation for the actual specification, quantities, finish and packing. Keep the manufacturing lead time separate from transport time, and record the event that starts the agreed production period.

How do I compare factory quotations?

Use the same drawing and component schedule for every supplier. Check whether beam levels, frames, accessories, packing and delivery costs have the same definition. Our pallet racking quotation comparison guide helps compare specifications, component lists and delivery scope.

Get a Quotation for Your Racking Order

Send your product list, quantities and delivery destination. We will help define the components and packing to include in the quotation.

Contact Our Sales Team

PACKING & DISPATCH

Packing for Transport and Handling

Packing must suit transport, handling and unloading. Agree the protection and package details for your order before dispatch.

A wooden crate inside an open shipping container.
A wooden crate inside an open shipping container.
Wrapped goods arranged inside an open shipping container.
Wrapped goods arranged inside an open shipping container.
Container door latch and seal.
Container door latch and seal.

Confirm unloading responsibilities and dispatch documents with the order.

View racking applications → · View CAD and 3D concept →

Specify packing and handling →

FACTORY VISITS

Visit Our Factory in Shenyang

Arrange a factory visit with our sales team. Send your preferred dates and visit purpose.

Shenyang Yida factory entrance
Shenyang Yida factory entrance.