Pallet Racking Export Packing and Container Loading Checklist

A wooden transport crate inside an open shipping container
Transport crate inside a container. Packing and securing requirements must be confirmed for the actual shipment.

An export racking order needs a packing schedule that can be matched to the component list. Before comparing freight quotations or booking a container, establish the package dimensions, gross weights, handling points and delivery responsibilities. A number of bays alone is not enough to calculate shipment volume.

Ask for one package schedule

Packing fieldWhat to confirmReceiving purpose
Package IDUnique mark linked to the order and drawing revisionMatch the delivered package with the packing list
ContentsComponent references and quantities in each packageFind beams, frames, bracing, fixings and accessories
Packed dimensionsOverall length, width and height with unitsReview space and handling requirements
WeightsNet and gross weight per package, with unitsPlan handling and transport within applicable limits
ProtectionAgreed surface, edge and contact protectionSet the expected packing condition
HandlingLoading/unloading method, lifting information and stacking restrictionsCheck equipment and receiving arrangements

Keep component count and package count separate

A bundle containing several beams is one package but several components. Small fixings may be packed separately from large structural parts. Ask the supplier to reconcile the packing list with the final itemized order, including locking devices, anchors or other fixings only where agreed in the supply scope.

For a mixed distributor order, retain the destination or product-group identifier beside every package. For a project order, agree whether marks should help identify the intended row, component reference or assembly group. Confirm the marking system before production and packing.

Calculate volume from measured packed dimensions

Illustrative example: a package measuring 3.0 m × 1.0 m × 0.6 m has an external rectangular volume of 1.8 m³. Ten identical packages total 18 m³ on that arithmetic basis. This is a volume example, not a container-loading plan or a promise that those packages fit a particular container.

Actual loading also depends on package shapes and orientation, door and internal dimensions, gross weight, allowable loading distribution, handling access, securing requirements and stacking restrictions. Check the chosen equipment and route with the responsible carrier or loading provider. Do not estimate a universal “bays per container” figure from this example.

Agree who performs each shipment task

Record the agreed trade term, named port or place and rule version. Identify export packing, loading, freight, insurance, destination handling, inland transport and unloading as included, excluded or awaiting confirmation. Use the project cost comparison to keep the endpoints consistent.

Prepare receiving and discrepancy records

Arrange the unloading equipment and receiving team against the final package schedule. Check marks, quantities and visible condition, retain photographs where needed and record discrepancies against the relevant package and component reference. Confirm any unpacking or inspection procedure with the responsible team before delivery.

Review manufacturing and packing processes and the order document checklist. Send the component list, destination, intended unloading method and required packing records using the RFQ worksheet or inquiry form.

Equipment reference: Hapag-Lloyd container specifications. Actual equipment dimensions and weights must be confirmed for the booked unit.

Compare a 20-foot and a 40-foot container on the same shipment

Ask for two quotes based on the same packing list, origin, destination and charge coverage. Compare packed bundle lengths, pallet footprints, gross weight and access for unloading. Assess landed freight per complete sellable kit or project with the carrier’s actual equipment limits.

View manufacturing and packing · Request a racking quote