Mezzanine Racking

Explore additional storage levels within your available warehouse height.

Multi-level mezzanine racking arrangement

Mezzanine racking adds storage levels within a warehouse, commonly for shelving and manual picking. A useful layout starts with the building and the way people and goods need to move between levels.

Start with the building dimensions

Share the clear height, column positions, floor information, doors and overhead obstructions. These conditions determine whether a multi-level arrangement is a practical option for the space.

Define the work on each level

Explain what will be stored, the expected loading and how staff will pick and replenish goods. Storage space, working areas and goods-transfer points need to be planned together.

Allow for access and local requirements

Stairs, pedestrian routes, loading points and emergency access are part of the layout. Structural design, the existing floor and local approval requirements need qualified engineering assessment before the arrangement is finalized.

Would a single-level layout work better?

Where headroom or goods movement limits a mezzanine, long span shelving may provide a simpler picking arrangement. Compare the usable storage and daily workflow, as well as the floor area.

Explore Long Span Shelving →

Prepare a multi-level storage brief

Describe the goods and work on each level, usable clear height and goods-transfer points so the quotation covers the intended arrangement.

Use the RFQ Checklist →

Mezzanine racking quotation specification

Prepare a multi-level storage brief for factory supply to distributors and project contractors. Identify storage and goods movement on each level before fixing the component list.

Quotation item Information to send
Building Clear height, floor plan, columns, doors, overhead services and available floor information.
Storage task Goods dimensions, weights, picking and replenishment on each level.
Load basis Storage and operating loads for review, including their distribution.
Access Stairs, pedestrian routes, goods-transfer points and handling method.
Responsibilities Drawing scope, structural and floor review, local approvals, installation, packing and delivery.

A concept or quotation is not project engineering approval. Confirm the responsible qualified providers and local requirements before finalizing the arrangement.

What if the building cannot support the proposed arrangement?

Keep the layout provisional until the building, floor and engineering requirements have been reviewed. Compare a single-level picking arrangement where appropriate. Use our RFQ checklist to identify missing information.

Make better use of your warehouse height

Request a Mezzanine Racking Quote

Define the structure before comparing mezzanine quotations

Arrangement to clarify What the buyer should establish
Rack-supported mezzanine Which rack structure supports the floor and how storage loads and floor loads are specified together.
Freestanding steel platform Which columns and beams support the floor independently, and what equipment or storage will occupy the space.
Multi-tier picking shelving How shelf levels, walkways and movement of people and goods are arranged.

These descriptions identify different purchasing scopes. Confirm which arrangement HAO RACKING can quote for your project; the terms are not interchangeable and this table does not promise every configuration.

Use one floor and access schedule

Give the proposed footprint, clear height above and below the floor, stored goods, maximum loads and any concentrated equipment loads. Describe pedestrian access, stairs, guardrails, gates and goods-transfer points. Identify any floor surface, fire protection, lighting or building work to be included or supplied locally.

Keep the quotation in three parts: structural components and floor system; access and protection items; documents, installation and approval responsibilities. A missing stair, gate or floor finish is an open scope item, not a zero-cost inclusion.

Agree the release documents

Identify the responsible parties for structural calculations, the existing slab and foundations, building interfaces, fire and escape requirements, installation and local approvals. Keep a drawing revision and an itemized component schedule with the accepted offer. Changing the use of the floor or installing equipment requires review of the relevant design assumptions.

Download the RFQ worksheet and send the available building plan, goods description and proposed floor use. Mark unknown loads and dimensions for confirmation.