Pallet Racking Bill of Materials: What to Check Before Ordering

Published:

A practical component checklist for distributors and installation contractors.

Inside the Shenyang Yida production workshop
Production workshop in Shenyang. Match the order’s component list to the approved layout and drawing revision before production.

A pallet racking bill of materials (BOM) lists the components included in an order. For a distributor or installation contractor, checking that list against the layout can expose missing beams, unclear frame quantities and unpriced accessories before the purchase order is confirmed.

Start with three documents: the approved layout, its drawing revision, and an itemized BOM. A total price or a statement such as “100 pallet positions” is not enough to establish exactly what will arrive.

What should a pallet racking BOM include?

Ask for an item reference, description, specification, unit and quantity for each supplied component. The list should distinguish assembled frames from loose upright columns, individual beams from beam pairs, and standard equipment from optional accessories. Reference the same component codes on the drawings, quotation and packing list.

Item What to confirm Common ambiguity
Upright frames Height, depth, section reference and whether supplied assembled “Upright” may mean a column or a complete frame
Beams Length, section, connector reference and quantity in pieces Pairs and pieces are confused
Bracing and frame hardware Whether included in the frame line or listed separately Loose frame parts appear to be missing or counted twice
Base plates, anchors and shims Supply scope and references required by the project design Installation materials are assumed to be included
Decking and pallet supports Type, dimensions, support arrangement and quantity “One set per level” has no defined component count
Protection and signs Specified protectors, barriers and load notices Items shown on a drawing are not priced

Count rows, bays and beam levels separately

Check the terminology before checking the arithmetic. A row, a bay, a beam level and a pallet position describe different things. State whether floor storage is counted as a pallet level and whether the quoted number of rows includes both sides of a back-to-back arrangement.

Illustrative quantity check: consider one uninterrupted row of four bays, sharing intermediate frames, with three beam-supported levels in each bay. If each level uses two beams, that arrangement has five frames and 24 individual beams. These numbers are an example of counting only, not an engineered layout or a capacity recommendation. Separate rows, different bay types and project details change the quantities.

Ask the supplier to explain a quantity that does not match your layout. Do not reduce component counts simply to match an example.

Verify the specification, not just the dimensions

Two BOM lines can have the same overall dimensions while referring to different components. Record the supplier’s section and connector references so a later clarification or reorder can identify the actual part. Keep the approved drawing revision with the BOM rather than relying on a photograph or a general product name.

Capacity must relate to the specified system and configuration. A BOM is a supply list, not a substitute for the required design and capacity documentation. For an existing installation, do not treat a similar-looking beam or upright as interchangeable. The Rack Manufacturers Institute’s guidance on component compatibility explains why manufacturer-specific connections require appropriate evaluation.

For the information to send when checking an existing system, see our beam and upright compatibility checklist.

Make included and excluded items explicit

Ask for a short scope statement beside the BOM. For example, are anchors, decking, row spacers, guards and installation included, excluded or awaiting project confirmation? If a component depends on a floor assessment or local design review, mark it as pending rather than quietly assuming a generic solution.

Keep optional items in separate lines. This makes supplier quotations easier to compare and reduces the chance of approving a lower total that covers a different package. Our guide to comparing racking quotations covers the wider commercial comparison.

Separate installation quantities from spare stock

If you want spare stock, list it separately from the components needed for the planned installation. Agree the part references, quantities and packing labels. Avoid using an arbitrary percentage for every item: the useful spare mix depends on your installed systems, service needs and the manufacturer’s approved replacement scope.

For mixed orders, use a project or customer reference on each BOM section. Confirm whether identical parts can be packed together or must remain separated by destination. Then reconcile the final packing list with the approved BOM; use our export packing checklist for shipment preparation.

A short checklist before approving the order

  1. Use one agreed drawing revision and identify any outstanding changes.
  2. Confirm row, bay and level definitions, including floor storage.
  3. Check frame quantities and count beams in a clearly stated unit.
  4. Record component specifications and references.
  5. Mark accessories and installation materials as included, excluded or pending.
  6. Separate spare parts and project-specific packing requirements.
  7. Resolve discrepancies in writing before confirming production.

Send a layout or component list for review

HAO RACKING supplies warehouse racking from Shenyang, China, for distributors, installation contractors and system integrators. Send your layout or component list with dimensions, loads, quantities and destination so we can clarify the proposed supply scope and prepare a quotation.

Request an itemized racking quotation, or use the racking RFQ checklist to organize your requirements.

Frequently asked questions

Is a BOM the same as a packing list?

No. The BOM defines the agreed component supply. The packing list describes the goods packed for a shipment. Check the final shipment quantities against the approved BOM and record any agreed split deliveries.

Should beams be ordered as pairs or pieces?

Either unit can be used if it is explicit and consistent. Confirm how many individual beams each quoted unit represents before comparing totals.

Can a BOM confirm load capacity?

A component list alone cannot confirm the capacity of the installed system. Keep the relevant design, configuration and capacity documentation with the order.